Somerset Levels floods, winter 2013 to 2014

Record winter rain drowned 6,900 hectares of drained farmland for weeks, cutting off villages and prompting a £100 million flood plan.

  • Verified
  • United Kingdom
  • 1 February 2014
  • Library

Verification state

This case study is marked verified. Checked by a person against every source. Safe to learn.

The event was 13 years ago, and the verified state covers 21 days after the event and older.

Evidence

10 figures, each threaded to its source

Homes evacuated

600homes

3 sources

internetgeography.net

Over 600 homes and 16 farms were evacuated

Farmland flooded

6,900hectares

2 sources

en.wikipedia.org

over 600 houses and 17,000 acres (6,900 ha) of agricultural land

UK rainfall from 1 December to 19 February

486.8mm

2 sources

channel4.com

the UK has had 486.8mm of rain up until the 19 February

Cost of the 20 year Flood Action Plan

100 millionGBP

2 sources

internetgeography.net

part of a 20-year plan for the Somerset Levels and will total £100 million

Length of rivers dredged in 2014

8km

2 sources

floodlist.com

The dredging of an 8km stretch of the Rivers Parrett and Tone in Somerset has now been completed.

Silt removed by dredging

130,000cubic metres

2 sources

floodlist.com

around 130,000 cubic metres of silt has been removed from the two rivers

Estimated cost of flood damage

10 millionGBP

2 sources

internetgeography.net

Somerset County Council estimates that the cost of flood damage was over £10 million

Farms evacuated

16farms

2 sources

internetgeography.net

Over 600 homes and 16 farms were evacuated

Length of the Somerset Flood Action Plan

20years

3 sources

gov.uk

one of the first actions for the 20 year Somerset Flood Action Plan, co-ordinated by Somerset County Council

Years since the rivers were last dredged

20years

tutor2u.net

local rivers had not been dredged for more than 20 years

Background

The Somerset Levels are a wide area of flat, low-lying land in south west England, much of it former wetland drained for farming over hundreds of years. Rivers such as the Parrett and Tone cross the Levels slowly, and ditches and pumps keep the fields dry. In the winter of 2013 to 2014 a queue of Atlantic storms crossed Britain, and the UK received 486.8 mm of rain, its wettest winter on record. Water poured off the surrounding hills onto land that sits close to sea level, the silted rivers overflowed, and high tides held the water back. Around 6,900 hectares of farmland went under water for weeks. Over 600 homes and 16 farms were evacuated, and villages such as Muchelney and Moorland became islands reached only by boat. Damage came to more than £10 million. Afterwards the government backed a £100 million, 20 year Flood Action Plan, which began by dredging 8 km of the Parrett and Tone and went on to raise roads and strengthen pumping.

Causes

A record run of winter storms

Atlantic depressions crossed Britain one after another from December to February, giving the UK 486.8 mm of rain, the most for any winter on record. The ground was saturated by Christmas, so later storms produced runoff almost immediately and river levels never had time to fall.

Low-lying drained wetland

The Levels are former marshland, drained over centuries and kept dry by ditches and pumping stations. Much of the land lies close to sea level, so water flows onto it from the surrounding hills but cannot drain away by gravity. Once the fields flooded, the water simply sat there for weeks.

Silted river channels

The Rivers Parrett and Tone had not been dredged for around 20 years, and silt had built up in their channels. With less room to carry water, the rivers overflowed sooner and more often than they would have done with clear channels, which is why dredging became the loudest local demand.

High tides blocking drainage

The Levels drain into the Bristol Channel, which has one of the biggest tidal ranges in the world. High tides pushed seawater up the Parrett and held river water back inland, so even when the rain paused the floodwater on the moors was slow to escape to the sea.

Effects

Primary

  • Around 6,900 hectares of farmland were under water for several weeks.
  • Over 600 homes and 16 farms were evacuated.
  • Villages including Muchelney and Moorland were cut off when the roads around them flooded.
  • Main routes across the moors, including the A361, were closed for weeks.

Secondary

  • Around a thousand livestock had to be moved off flooded farms.
  • Residents lived in temporary accommodation for months while homes dried out.
  • Journeys to school, work and shops needed long detours or boats.
  • Local businesses lost trade while the area was cut off and in the news.

Social

  • Families spent months out of their homes after the water went down.
  • The long isolation and uncertainty were stressful for cut-off communities.
  • Volunteers and community groups organised boat lifts, supplies and shelter for neighbours.

Economic

  • Somerset County Council put the cost of the damage at over £10 million.
  • Farmers lost winter grazing and crops, and flooded fields stayed unusable into spring.
  • The clean up and the £100 million action plan that followed were major public costs.

Environmental

  • Floodwater mixed with sewage, fuel and farm chemicals spread across the moors.
  • Waterlogged soils were left compacted and grassland died back after weeks under water.
  • Later dredging changed the channels and banks of the Parrett and Tone.

Responses

Immediate

  • Giant pumps, some brought from the Netherlands, worked around the clock to move water off the moors.
  • Boats carried residents, schoolchildren and supplies in and out of cut-off villages such as Muchelney.
  • Royal Marines and emergency services helped evacuate homes and build sandbag defences.
  • The government promised extra money for affected households and farmers.

Long term

  • The £100 million, 20 year Somerset Levels and Moors Flood Action Plan was agreed in 2014.
  • An 8 km stretch of the Rivers Parrett and Tone was dredged within the year, removing around 130,000 cubic metres of silt.
  • The road into Muchelney was raised so the village keeps a dry route in future floods.
  • The Somerset Rivers Authority was created to fund ongoing maintenance, and a tidal barrier on the Parrett at Bridgwater was planned.

What this example answers

These are the requirements this example answers. Choose an exam board and they carry that board's own spec codes.

Reporting a wrong tag arrives in a later phase

VerifiedUnited KingdomLibrary

Banbury flood management scheme

An £18.5 million storage reservoir beside the M40, opened in 2012, holds back the River Cherwell to keep Banbury dry.

  • Flood management
VerifiedUnited States26 September 2024

Hurricane Helene, USA, 2024

A Category 4 Florida landfall became an inland flood disaster in the Appalachians, killing at least 250 people.

  • Tropical storm, HIC
  • Tropical storm
  • River flood event
ProvisionalNepal26 August 2026

The 2026 Nepal-Tibet border flash flood

A glacier collapse triggered a flash flood on the Lhende River, killing dozens and leaving hundreds missing on the Nepal-Tibet border.

  • River flood event
VerifiedUnited Kingdom24 January 2025

Storm Eowyn, UK and Ireland, 2025

An explosively deepening Atlantic storm broke Ireland's wind record and left more than a million without power across Ireland and Scotland.

  • UK extreme weather